From
Pro Roofers Inc Keyvan Keyvanpour
WSIB#: 6777747 HST#:790294888
Phone: 416-277-1555
Date
June 29, 2022
Estimate Number
20220629-4130
Expiration Date
July 29, 2022
Estimate Total
$37,968.00
  1. Service
    Price
    Amount

    Shingles:

      • Protection of customer’s house, property and gardens.
      • Supply and install ice and water shield caves protection to maximum of 3 feet from eaves.
      • Supply and install all new roofing material using Cambridge or BP Mystique shingles.
      • Supply and install hip and ridge cap.
      • Supply and install heavy gage pre painted metals valley.
      • Supply and install all new vent maximum of 10.
      • Supply and install new 4”Exhaust vent maximum of 6.
      • Supply and install ODO flashing pipe.
      • Thoroughly seal all flashing using high-grade caulking.
      • Completely removal of all roof equipment and debris.
      • Final. Tidy and clean up to the complete client satisfaction.

    Flat Roof:

         Supply and install 1/8 protection Board.

    • Supply and install SBS 2.2 Base torch down.
    • Supply and install SBS 250 Cap torch down.
    • Supply and install aluminum Mushroom vent up to 6.
    • Supply and install exhaust vent up to 4.
    • SKYLIGHT:
    • Supply and install 1- Velux 4672 FCM fixed skylight Curb Mount.
    • Supply and install 3- Velux 4646 FCM fixed skylight Curb Mount.
    • Supply and install 1- Velux 2246 FCM fixed skylight Curb Mount.
    • Supply and install 2- Velux 2222 FCM fixed skylight Curb Mount.
    • Please be advised the square footage for Shingles has been calculated for 1800 sq ft and Flat Sections is roughly 2500 sq ft so the final quotation may very.
    • The skylight has been quoted with flashing and installation but if you choose the special Dome skylight for flat price will be higher.
    • Please check my website for materials and skylight.
    $33,600
    $33,600
Subtotal $33,600.00
Taxes $4,368.00
Total $37,968.00

Terms

Upon acceptance, a 50%deposit is required upon signing and prior to commencement of the project.

Updated
June 29, 2022 @ 8:43 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:44 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:46 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:47 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:52 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:53 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 8:58 pm

Estimate updated by Keyvan Keyvanpour.

Updated
June 29, 2022 @ 9:00 pm

Estimate updated by Keyvan Keyvanpour.

Viewed
June 29, 2022 @ 9:00 pm

Estimate viewed by 34.134.15.254 for the first time.

Viewed
June 30, 2022 @ 11:58 pm

Estimate viewed by Keyvan Keyvanpour (keyvan) for the first time.

Viewed
December 3, 2022 @ 2:39 pm

Estimate viewed by for the first time.